Andvora
Operations Platform
Andvora / Product: Changeover Control

Cut product changeover time and startup material losses.

Andvora helps production teams log changeover stages, isolate root causes of delays, and quantify scrap before stable production resumes.

Public demo runs on simulated shift data. Zero physical machine connection required.

LINI #04 • DIE & TOOLING SWAP SPECIMEN
Target vs Actual Duration: 45m → 62m (+17m)
Startup Scrap Tally: 28.5 kg (Purge & Afval)
First-Piece Quality Gate: DISETUJUI (QC)
Corrective Action (CAPA): PIC: Budi (Mtc)

Root Operational Bottlenecks

Three cost-leakage points during product changeovers

Many extrusion plants treat setup downtime as an inevitable fixed cost, even though most delays stem from lack of standard workflow enforcement.

01 /

Setup Logged as a Black Box

Shift reports aggregate "Setup 60m". Management never sees whether 20m was lost waiting for clamp bolts, die heating drift, or raw material delivery.

02 /

Startup Scrap Never Measured

Degraded purge lumps and off-gauge trial profiles are discarded into scrap bins without weight logging or attribution to specific job transitions.

03 /

The Same Bottlenecks Repeat

Without structured corrective actions assigning specific owners to deadlines, night shift setup technicians encounter the exact same tooling breakdowns.

5-Stage Closed-Loop Workflow

Prepare → Execute → Measure → Review → Improve

A closed-loop system enforcing external SMED readiness prior to line stop through post-run corrective action verification.

01 / PREPARE

External Readiness

Verify target die, dried resin, color dosing, and QC calipers at the machine before stopping the line.

02 / EXECUTE

Setup Stages & Delays

Log duration per setup step (strip-down, purge, die mount, thermal soak). Tag specific delay causes in real time.

03 / MEASURE

Scrap Weight & QC Gate

Weigh startup purge lumps and trial pipe. Enforce first-piece quality gate signoff before line ramps to run speed.

04 / REVIEW

Loss Pareto & Handover

Analyze downtime Pareto rankings and export structured shift handover briefs without data disputes.

05 / IMPROVE

Corrective Action (CAPA)

Assign action items to maintenance leads with due dates and verified prevention signoffs.

Operational Deliverables

What plant teams receive for every logged changeover

Structured operational data ready for daily shift standups and quality compliance audits.

1. Stage Duration Variance

Planned vs Actual Time

Minute-by-minute duration deviation per setup stage with variance alerts.

2. Technical Delay Root Causes

Root Cause Categorization

Categorization into mechanical, electrical, resin, or procedural bottlenecks.

3. Material Scrap Quantification

Kilograms of Purge & Off-Gauge

Total scrap weight in kg and estimated material cost when unit price is supplied.

4. First-Piece Quality Gate

QC Inspector Signoff

Certified approval of dimensional tolerances before lines resume production.

5. Audit-Ready CAPA

Assigned Owner & Due Date

Corrective action registry with two-step effectiveness verification.

6. Shift Handover Brief

Clean Shift Handover Export

Copyable handover brief and structured JSON export for daily production reports.

Intended Plant Roles

Built for practitioners accountable for line throughput

Plant / Operations Manager

Monitors cross-line loss Pareto rankings, evaluates setup consistency, and tracks startup scrap material costs.

Continuous Improvement Engineer

Standardizes SMED sequences, analyzes operator setup time variance, and validates CAPA effectiveness.

Shift Supervisor & Technician

Logs setup steps and delays in seconds via line-side tablet without retyping notes during shift handover.

Quality Control Inspector

Certifies first-piece dimensional tolerances before operators ramp the extruder to standard production speed.

Next Operational Step

Validate the workflow on 1 designated bottleneck line.

We offer a controlled plant pilot to verify that your shift technicians can adopt standard logging discipline and expose valid loss data.