Plastic Extrusion OEE & Downtime Workflow Demo
Test the 4-step supervisor workflow: (1) Log shift output & downtime, (2) Decompose 6 Big Losses mathematically, (3) Formulate 5-Whys countermeasures, and (4) Dispatch handover notes. Runs locally in your browser with zero login.
Line: Extruder #04 (Rigid PVC Pipe Ø 110mm) • ISO 22400-2 & TPM Nakajima Taxonomy
Adjust production shift parameters below to test real-time OEE recalculation.
Live Auto-Calculate ActiveAdjust cycle times, breakdown durations, and scrap counts in real-time. Zero sign-up, zero installation; runs in local browser memory.
Planned Time (480m) = Productive Run + Breakdown + Setup + Speed Drag + Scrap. Consistent math across shifts to eliminate spreadsheet arguments.
Deploy on 1 critical extrusion bottleneck line. We configure plant reason codes, onboard shift supervisors, and deliver executive baseline audit reports.