Andvora
Operations Platform
01 / SHOPFLOOR OS INTERACTIVE SIMULATION ISO 22400-2 STANDARD

Plastic Extrusion OEE & Downtime Workflow Demo

Test the 4-step supervisor workflow: (1) Log shift output & downtime, (2) Decompose 6 Big Losses mathematically, (3) Formulate 5-Whys countermeasures, and (4) Dispatch handover notes. Runs locally in your browser with zero login.

OS
ANDVORA SHOPFLOOR OS • OEE & DOWNTIME TERMINALSIMULATION MODE

Line: Extruder #04 (Rigid PVC Pipe Ø 110mm) • ISO 22400-2 & TPM Nakajima Taxonomy

Line Preset:
OVERALL EQUIPMENT EFFECTIVENESS
87.3%
Target: 85.0%+2.3 pp
Availability (A)432m / 480m
89.9%Stop: 48.5m
Performance (P)-8m Drag
98.3%2120 pcs @ 12s
Quality (Q)2095 Good
98.8%Scrap: 25 pcs

Adjust production shift parameters below to test real-time OEE recalculation.

Live Auto-Calculate Active
Standard 8h shift = 480 minutes
Loss #1: Die jam, loose clamp, drive trip
Loss #2: Dimensional tuning & warmup
Nameplate design speed: 12.0s = 5 pcs/min
Gross count exiting downstream cutter
Loss #5 & #6: Purge scrap + wall variation
01 / BROWSER SANDBOX
Risk-Free Self-Exploration

Adjust cycle times, breakdown durations, and scrap counts in real-time. Zero sign-up, zero installation; runs in local browser memory.

02 / CALCULATION INTEGRITY
Standard ISO 22400-2 Formulas

Planned Time (480m) = Productive Run + Breakdown + Setup + Speed Drag + Scrap. Consistent math across shifts to eliminate spreadsheet arguments.

03 / NEXT STEP
14-Day Plant Pilot Onsite

Deploy on 1 critical extrusion bottleneck line. We configure plant reason codes, onboard shift supervisors, and deliver executive baseline audit reports.