Andvora
Operations Platform
Andvora / Free Initial Pilot · 14 Days

Shopfloor Improvement Pilot — One Production Line

A free initial 14-day pilot to select one measurable problem—such as downtime, material shortages, defects, or rework—and try a practical logging and follow-up routine with the plant team. No savings or OEE improvement is guaranteed.

Baseline & data qualityDefinitions, scope, and event completeness.
Top recurring lossesDowntime, materials, quality, or rework, depending on the pilot focus.
Actions & next decisionOwners, verification, and a post-pilot recommendation.
01 / PILOT EXECUTION PHASES
HARI 01–03

Configuration & Kickoff

Agree on one line, problem definitions, shift target, logging method, and data access and handling. Brief the supervisor and team.

HARI 04–10

Floor Logging Routine

The team records events relevant to the selected problem using an agreed format. The facilitator helps check logging consistency.

DAYS 11–13

Review Patterns & Follow Up

Review logged events with the process owner. If the data is sufficient, identify early patterns; prioritize actions, assign owners and due dates, then verify.

HARI 14

Pilot Review & Next Decision

Deliver a scoped baseline summary, patterns and data-quality limits, an owner-based action list, and next-step recommendations.

02 / DATA SUFFICIENCY & PILOT SCOPE

What can 14 days tell us?

The pilot looks for early patterns in logged events; it does not prove causation statistically. If the issue is infrequent or records are incomplete, findings will be labeled as signals and the observation period can be discussed.

Scope follows plant readiness

Before kickoff, we agree on the line, event types, logging method, and deliverables. The pilot requires no sensors, PLC changes, or system integration.

03 / SERVICE BOUNDARIES & INTEGRATION POLICY

Objectively Measured Facts

  • Event or downtime duration (minutes)
  • Agreed disruption categories
  • Defect, rework, or scrap counts when relevant
  • Record completeness and source

Modeled Baseline Projections

  • Estimated time or output impact
  • Indicative cost only if the plant provides assumptions
  • Action priorities based on logged events

Explicit Service Boundaries

  • Zero automated OEE promises without physical execution
  • Pilot facilitation and the logging format are agreed before kickoff
  • No sensor, PLC/SCADA, or system integration
  • Customer data is handled under a written agreement
04 / FACTORY PILOT INQUIRY FORM
PLANT PILOT INQUIRY FORM

Targeted trial on 1 bottleneck line. We will review the fit and contact you about next steps.

Free · 14 Days1 Bottleneck Line

Share general context only—do not include production records, worker names, or confidential information. Before a pilot, we will agree in writing how operational data is accessed, transferred, stored, and deleted.

✓14-Day Pilot • 1 Line • Event Review & Owner-Based Action List